Wednesday, May 23, 2012

Day 39 - Rv - Foundation!

Today we headed to the land to watch the foundation being poured.  The inspector arrived shortly after we did and performed his inspection.  Everything was as it should be so the concrete trucks were dispatched.  Two trucks arrived and started pouring the concrete.  Only two guys were working so they had to work fast to keep the concrete from drying before it was smoothed out.  The boys enjoyed watching the trucks and all of the concrete being poured!  After they were done with the initial smoothing the boys were able to scratch their names into the concrete and we also put the date.  It is getting exciting!! The concrete will dry for several days before they will move the house.  Since Monday is a holiday they are expecting to move it on Tuesday.