Monday, June 18, 2012

Day 65 - Rv

We have not heard anything about the house since last week so Troye said we could ride out and see what was going on.   When we arrived there was lots of activity going on!! Yea!  The culvert had been delivered and rock for the road was being delivered! When we got to the house there was a guy working on the interior.  He was sheetrocking and patching and taping and floating!  He let us walk thru the whole house - this was the first time we saw some of the rooms!  I honestly didn't want to leave! Ha!  I kept visualizing where things were going to go!  But we needed to let the worker continue working!  He is hoping to be done with the inside by the end of next week.  Outside the house the guys were working on the road and digging the ditch for the water line.  We have not heard from the water company in a week so I called to see when the water meter would be installed.  They of course never called back!  Ugh!  But just before we were leaving a guy stops by and says he is from the water company.  He then gives us the bad news.... the water line is across the road (we thought this was the case) and we are responsible for having someone bore under the road and the cost of that!  This was news to us and our contractor!!!  Both our contractor and I have spoken with them several times and never was this told to us!  So yet another delay!  We will see what they say tomorrow because the guy thought we knew that and said he would check into things. 

No comments:

Post a Comment